What evidence should an integration acceptance review include?

Illustrative acceptance scenarios, not customer results or a list of features included in every TTI product. The platform and written proposal define the actual scope.
CheckExpected behaviourEvidence to review
Variant matchingThe selected colour or size links to the correct record.Central code, channel barcode and a sample variant mapping.
Inventory updateThe quantity allocated for sale is sent to the intended channel.Source quantity, submitted value, confirmed destination value and times.
Transfer resultPending and failed items remain distinct from completed work.Transfer reference, item result and failure explanation.
Repeated order readNo second sale or stock movement is created.Channel order/shipment references linked to the central record.
Cancellation or returnStock changes at the agreed business event.Status history, warehouse receipt and inventory movement.
Connection outagePending work is visible with a clear owner.Last completed transfer, error record and next action.

Write down which connection you are testing

Start with the seller account, central system, product group and data direction. Publishing products, sending stock, updating prices and importing orders are different operations. A working operation does not establish that the others have been delivered. A clear boundary helps connect an observed problem to the right part of the workflow.

TTI ERP’s existing Trendyol order connection and TTI WEB’s Excel/CSV product tools have different scopes. Uploading a file does not create ongoing inventory and order synchronisation. New connections require a separate review of platform access and delivery scope.

Choose a sample variant from a product family

As an illustrative example, consider black and tan versions of the same bag. Separate central codes must match the intended channel records. A similar product name alone is not enough to confirm the mapping. Review codes, barcodes and variant attributes together, leaving ambiguous records for approval.

One acceptance step could state that changing the black variant’s quantity must leave the tan variant unchanged. Writing the expected result before testing gives the review a specific target beyond the overall appearance of the screen. This is a proposed scenario; actual records and matching rules depend on the business.

Explain how physical stock becomes the quantity for sale

After identifying the stock source, define what quantity should reach the channel. In an illustrative calculation, 10 physical items minus 3 reserved items and a safety allowance of 2 leaves 5 for sale. This is an example for discussing a business rule, not a default setting claimed for a TTI product.

Record the source, submitted and destination quantities with their times. If a new order occurred between observations, include that movement when interpreting the difference. Specify the start and end used to measure a delay rather than assuming that all channels receive a change at the same instant.

Verify each item after submitting an update

Trendyol’s inventory and price documentation requires a separate result check. Its batch-result documentation specifies item-level outcomes for inventory and price updates. Submission and verified completion should therefore remain distinct operational states. The official documents are listed in the sources section.

Use a correctly mapped record and an incomplete one in the acceptance exercise. The expected behaviour is a visible failed item with an understandable next correction. Review the failure reason, last valid value and retry conditions before sending the same data again.

Follow the order and its shipments together

Trendyol’s order documentation distinguishes the main order from shipment references; one split order can correspond to several packages. Record shipment relationships alongside the order number. Test that a repeated read does not create another sale and that a changed status updates the intended existing record.

Define the expected stock movement for cancellations and returns separately. A return request, physical warehouse receipt and release for resale are different moments. Establish the business acceptance rule before treating a return status as a reason to increase available stock.

Connect acceptance evidence to launch and operations

Each scenario needs an expected result, observed result, date, sample record and owner. Failed or pending checks need a clear next action. Use examples with personal information removed and keep access keys out of screenshots or public reports.

Agree support contacts, outage follow-up and a rollback plan before launch. Reassess relevant scenarios when platform services or business rules change. This checklist is a framework for a scope discussion with TTI, not evidence that every marketplace has already passed testing or achieved a business result.

Eight records to agree in an acceptance review

Fill these in for your own catalogue and order workflow. Observe results in an in-scope test environment or with agreed controlled records.

  1. Seller account, central system and transfer directions.
  2. Sample product, barcode and colour/size mapping.
  3. Stock source, reservations and the quantity to send.
  4. Submission reference, result check and pending-work tracking.
  5. Repeated order reads and shipment relationships.
  6. Cancellation, returned-goods receipt and resale conditions.
  7. Correction, retry conditions and an operational owner.
  8. Launch decision, support contact and rollback plan.

Sources and scope

Official Trendyol developer documents were reviewed on 26 October 2026. Technical examples describe that platform only. The acceptance matrix and scenarios are illustrative working proposals prepared by TTI for this guide. Recheck API versions and conditions before implementation.

RELATED SOLUTIONS

Marketplace integration ERP systems E-commerce